Rocks pulled from new driveway, the old camp before demolition..
Drilling and placing blast matt over the larger rocks to be removed..
Blasting complete.
Pouring the footing with the conveyor truck
The conveyor places the concrete where it is needed, at times, in places not accessable any other way.
Foundation wall field side. The grade from the back will taper to the front and cover most of the wall.
Foundation wall, showing frost wall 4 feet under floor level.
Foundation walls from driveway side, showing garage entrance.
Power pole and guide wire are set.
Yes this is the correct order for the picture, the foundation is gone, bad pour.
One of those things you hate to see, but can and did happen. Better to replace it now, then to have problems after a house is on it.
Pouring the new footing with a concrete pump truck.
Covering the newly poured footings with plastic, then blankets to keep in the heat.
Foundation walls are poured
New Foundation in, sealed, foamed and back filled
View from the field side
View of the lake from first floor level
First floor is decked over and the front wall is up.
The first floor system from below,, 16" trusses. Stairwell opening by the ladder.
First floor deck, showing stairwell to daylight basement and front wall showing door to deck and windows. Triple 2"x12" header with 1" foam between. Advantec flooring and wall shiething, spend the extra now, its forever.